Subtransmission Planning
June, 2006
By R. Austria, Pterra Consulting
One utility's bulk power transfer, is another, neighboring utility's
overloaded, under-voltaged supply path to distribution customers. The
subtransmission network (STN), as the name implies, underlies the
transmission grid, as in "supports, uplifts, undermines or weighs down".
STNs are simultaneously necessary and
bothersome. Their existence allows networks to meet reliability
criteria, and yet, they can also be the cause of congestions that reduce
transfer capability. Their use may lead to local cost impacts and yet
improve overall system operating economics. By their nature, STNs are
akin to transmission networks in that they influence reliability, are
non-controllable, in the sense that power flows naturally unless specific
devices such as FACTS equipment are added, and they exist for a long time.
Rather than be surprised by their sudden presence in our operating
grids, we can apply planning principles and have some measure of control and
understanding on their future influence and use.
If we name them, then we know their purpose ...
STNs are generically defined by either their voltage level or function, or
both. The typical voltage range is 34.5 to 138 kV, and a typical
functional description may be "that part of the grid that interconnects the
bulk transmission elements with the distribution elements." More
often, there is no specific term applied, just a part of the network that
has lower voltage and has less transfer capacity than others.
They may have been
designed in, as we may find in urban grids where the STN
serves the specific purpose of distributing incoming bulk power to the main
distribution substations. The voltage level is selected to require less
lightning and electric field protection, while still being high enough to
minimize losses and voltage drop to the load. The layout is redundant
so as to provide better than n-1 reliability, usually via a ring arrangement
with switching capability to transfer load to live circuits.
Or, STNs may be
legacy networks, retained after some necessary bulk system
development, such as high-capacity EHV transmission overlaid on a
overloaded, stressed grid. In these cases, STNs once were the bulk
transmission system and became
the underlying system. The STNs do not seem to be retired in these
cases, but are kept in
continuing service to provide support or as a backup system.
The Reliability Objective
In planning for STNs, the reliability objective as a minimum matches
that of the bulk transmission system. In fact, the STN is treated as
part of the transmission network for this purpose. Hence, single
contingency (or, n-1) criteria are a staple requirement. All other
system performance measures, including transfer capability, which are based
on the n-1 standard then implicitly account for STNs. In the context
of NERC class B contingencies, switching is not allowed; either the STN is
normally in service or it is not. (This leads to some unwelcome
consequences as shown in the Case Studies below.) This further implies
that stability, not normally impacted by outage of low-capacity STN
elements, may in fact be significantly influenced by STN configurations.
However, being closer to the load, STNs are also expected to, at least, not
degrade customer supply reliability. For distribution systems, this
reliability objective is with respect to "sustained interruptions"; or
interruptions to customers that last more than 5 minutes. The primary
indices are average time without service (SAIDI), average number of
interruptions (SAIFI) and average duration of interruptions (CAIFI). Fast switching, load transfers, and
system re-segmentation (when the STN is reconfigured to accommodate an
outage) are allowed redundancies in this type of reliability target.
[See reference 2].
Overall, given that one is able to calculate reliability based on component
outage probabilities, then the combined reliability objective of the STN is
better than n-1. [See Reference 1].
Applying a Planning Process
To plan an STN, we start with the basic building blocks for network
planning, comprising:
- A set of attributes to aim for - including cost, service
reliability, environmental impact, financial requirements, etc.
- A set of physical parameters - such as specifications for new
transmission (voltage level and capacity), available rights-of-way,
voltage and current uprating options, component and construction
costs, models of the existing interconnected system, operating
procedures, and so on
- A set of future scenarios, typically based on a range of load
forecasts, generation growth, distribution and bulk transmission
development, regulatory structures, market structures, etc.
Once, these are defined, there are several standard processes for conducting
the actual planning. One of these is shown in Reference 3, for a
least-cost integrated method applicable to deregulated environments.
The product of this process is a plan, with certain characteristics
for robustness and flexibility. The plan is a function
of the companion transmission and distribution developments.
The typical analytical tools are power flow, contingency analysis, short
circuit calculation, dynamic and transient stability, voltage stability, to
name the basic ones. Note that because of the switching features of STN, contingency analysis and stability analysis will need to account for
these adjustments in their solutions.
Certain software may balk at the modeling of subtransmission networks
because of the high impedance branches (when all branches are on the same
MVA base). An optimal power flow may be useful to conform the voltage
profile during the planning process.
Case Studies
Case Study 1. In this case study, we have a national power system
whose overall load is growing at 5% annually. It has a large urban
area in which 50% of the demand is concentrated. The urban area is
served by a separate utility from the company that provides transmission
service. In the planning horizon of ten years, the transmission
company plans to develop new voltage level transmission, double the previous
highest voltage level (a useful rule of thumb, reflecting economics), and
the urban utility needs to determine how it will develop the STN.
The feasible options, after some analysis, were:
- Uprate some of the existing circuits to the new highest voltage
level (see Techblog on Voltage Uprating,
July 2005), creating an internal ring of high voltage lines that offloads
the remaining STN.
- Develop a new "hub" substation within the urban area for the
higher voltage level and connect these via transmission lines on
high, steel poles (to minimize the right-of-way width and EMF
impact). This is the most expensive option.
- Sectionalize the STN to avoid parallel flows that impact their
thermal loading. This reduces the overload reliability
of supply to customers because redundancy is diminished. Some
switching capacity compensates for this. Overall, this is the
cheapest option.
  
Option 1 was chosen for its better provision of reliability at a
relatively small incremental cost to the cheapest option (option 3).
Case Study 2. We have a legacy STN that is impacting the
transfer capability of the bulk transmission system. The impacts are
thermal, voltage and stability, depending on the operating conditions. Furthermore, the STN is owned by a separate utility from others that own the
bulk transmission, although all belong to the same control area, and are
operated by the same ISO.
The options are:
- Operate the STN with certain segments normally open.
- Implement several Special Protection Scheme (SPS) to trip
a segment of the STN, switch in capacitor banks or shed generation
and load. Each addresses a specific contingency for a specific
operating state for a contingency overload, voltage violation,
voltage collapse or instability.
- Add phase-shifting transformers on the STN to control
flow.
- Reduce transfer on the bulk transmission and continue to
operate the STN in parallel with the bulk transmission.
   
The attributes of the optimal plan are a mix of both conflicting
objectives such as maintain reliability and reduce costs, complex
functions such as inter-utility relationships, and unbounded
uncertainties such as the future operating environment. When
viewed from different aspects and stakeholder viewpoints, the best option
changes. Option 4 was selected as the path of least resistance in this
particular case, although in similar situations in different locations
and times, all the other options have been applied in practice.
Many of the issues that were unresolved, but "accepted" by the choice
of Option 4 may have been avoided by proper planning of the STN.
Conclusions
Subtransmission networks, especially legacy ones, present a challenge to
operators and planners alike. However, understanding their nature and
being able to plan for their future use helps in better integrating STNs
with the rest of the grid. The benefits can continue to be realized,
while the disadvantages minimized. A defined planning process helps in
that the process itself helps understand the effects of the STN as the rest
of the power system evolves over time.
References
- Ricardo Austria,
et al, "Assessing
the Impact of substation-related outages on network reliability,"
Power System Technology, 2002. Proceedings. PowerCon 2002.
International Conference.
- Warren, C.A.; Ammon, R.; Welch, G., "A survey of
distribution reliability measurement practices in the US,"
Power Delivery, IEEE Transactions on
Volume 14, Issue 1, Jan. 1999 Page(s):250 - 257.
- Ricardo Austria,
R. Nadira, L. Cosenza, C. Fuentes, M. Avila, and J. Ramirez,
“Least-Cost Transmission Planning Considering Power Industry
Restructuring,” presented at the IASTED Conference, Orlando, FL.,
October 1997.
For questions, comments and further discussion, contact me at